you need
  • - plumbing;
  • - pipe;
  • - drywall;
  • - metal profiles;
  • - screws;
  • - mortar;
  • - tiles;
  • - grout;
  • - damp sponge;
  • - cord;
  • - nails.
Guide
1
Before repair work, check the condition of the walls, ceilings, floors, doors and door openings, as well as the entire system plumbing.
2
To make it easier to take out the garbage and remove the door.Doorway release of stocks.
3
Remove from the surface of walls, ceiling and floor old coating: ceramic tile, paint.Remove the old plumbing fixtures.
4
lined the walls in all planes to further converge tile joints.All corners in the bathroom should be straight for tight placement of the bath or shower.
5
Prepare the walls and floors.The floor in the bathroom do below 2 cm on the total floor apartment.
6
All electrical and plu
mbing work is carried out before finishing.
7
Make pipework.Cold water pipe located below the hot.For each point of abstraction (bath, toilet, sink), move the separate pipe.Make the corner drain sewer 2-3 degrees.
8
for wall and floor tiles suitable waterproof drywall, which will be a good basis for the tiles.
9
process it on both sides waterproofing compounds and water-resistant primer.Place the wiring in the frame structure, which must be made of metal profiles.Do not use a wooden crate in bathrooms 's.
10
Using plasters for leveling walls, use a cement-based solutions, which retain their characteristics in wet areas.Check plumb walls.If necessary, align layer of plaster.
11
Lay tiles after wiring pipes.For the floor, it should be rough and thicker wall tiles.The clutch produce on the well dried out the surface.
12
Set on a solution in the corners of the floor beacons.Place between rows of tiles, adjusted level.
13
Pull the cord on the nails between the outermost rows.Lay the tiles, check the horizontal level.
14
Laying on the walls start from the bottom.Seams seal the grout with a rubber spatula.Surplus clean sponge.
15
Set plumbing, mixers, switches, sockets, lamps and other accessories necessary to you.